Do you have an account?
Why create an account?
After creating an account you will :
- have access to the “favourites” feature,
- be able to download certain data published by RTE,
- have access to forms (PKI certificate, EIC code, Customer questionnaire - KYC),
- have access to notifications.
If you are an RTE customer, feel free to contact your administrator so that he or she can give you access to your company’s services.
Access the list of BRPs having a current valid participation agreement.
Access the national data used to calculate the BRPs’ imbalances and the temporal reconciliation for reconstituting the PDS flows.
Imbalance process and unique imbalance process
Data regarding week W (Saturday-Friday) are calculated and published before 23:59 on Friday of week W+1. The very same data regarding month M are updated and published before the end of months M+1, M+3, M+6 and M+12.
National reference load curve
This curve corresponds to net extraction in MW by the Public Distribution System on the Public Transmission System, calculated on the basis of metering data measured at HV/MV delivery point substations.
National Profiling Imbalance
This curve corresponds to the difference in MW between net extraction of Public Distribution System (PDS) on the Public Transmission System metered by RTE and aggregated Balance Responsible flows on PDS calculated by Grid Operators by the way of remote metering, profiling and estimating losses.
National alignment coefficient
This curve corresponds to the correction coefficient that will be applied to the consumption estimated by the DSOs for all the BRPs on the Public Distribution Network, to bring it back to its real level.
Additional national alignment coefficient
This curve corresponds to the correction coefficient calculated by replacing missing PDS energy (data not received by RTE on the calculation date) by the energies of the previous week by applying a D-7 copy method. These values are not used for calculating imbalance and temporal reconciliation.. This curve is only displayed as part of the historical imbalance process.
Distribution grid load curves aggregated at national level
These curves correspond in MW to the data provided by DSO and aggregated at national level:
- the estimated consumption load curve,
- the estimated generation load curve,
- the remotely-read consumption load curve,
- the remotely-read generation load curve,
- the estimated power loss load curve.
National Residual load curve
During the unique imbalance process, following the standardization step of estimated consumption by BRP, the estimated consumption of the BRPs does not capture the entire national profiling deviation. This delta constitutes the load curve for the national residual. Its daily energy is zero by construction.
Temporal reconciliation
Data regarding the period from July of year Y to June of year Y+1 are published before the end of October of year Y+2.
National Profiling Imbalance
This curve corresponds to the difference between net extraction of Public Distribution System (PDS) on the Public Transmission System metered by RTE and aggregated Balance Responsible flows on PDS calculated by Grid Operators and RTE during temporal reconciliation.
National alignment coefficient
This curve corresponds half-hour by half-hour points to the coefficient that corrects the consumption estimated by the Grid Operators on Public Distribution System during temporal reconciliation for all Balance Responsible flows in order to adjust her to the real level.
National Residual load curve
During temporal reconciliation, there exists an imbalance half-hour by half-hour period, between the national reference load curve and the sum of the load curves allocated to the balance responsible entities within the Public Distribution System. This imbalance corresponds to the lack of precision with regard to the profiles.
This imbalance in MW, calculated over a period of a year, constitutes the load curve for the national residue. Its annual energy is nil by construction.
Records of the data are available from the start of the flow reconstitution process. National PDS load curves are available from the 15th April 2018.
Publishing regarding the Temporal Reconciliation from July 2022 to June 2023 (RT19)
- Updated on October 2024,
- National Financial Residual is a credit of 825 545 €.
- Definitive Estimated Consumption National Energy is 190 280.065 GWh.